{"id":32421,"date":"2026-02-07T08:45:59","date_gmt":"2026-02-07T03:15:59","guid":{"rendered":"https:\/\/blogrevamp.cashfree.com\/?p=32421"},"modified":"2026-02-07T08:48:33","modified_gmt":"2026-02-07T03:18:33","slug":"state-wise-eway-bill-limit","status":"publish","type":"post","link":"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/","title":{"rendered":"E-Way Bill Limit in India: State-Wise Thresholds, Distance Rules &#038; Applicability"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_81 counter-hierarchy ez-toc-counter ez-toc-custom ez-toc-container-direction\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<label for=\"ez-toc-cssicon-toggle-item-6a8f38de30948\" class=\"ez-toc-cssicon-toggle-label\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #364250;color:#364250\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #364250;color:#364250\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/label><input type=\"checkbox\"  id=\"ez-toc-cssicon-toggle-item-6a8f38de30948\"  aria-label=\"Toggle\" \/><nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#What_Is_an_E-Way_Bill_Under_GST\" >What Is an E-Way Bill Under GST?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#Interstate_vs_Intrastate_E-Way_Bill_Limits_Rules\" >Interstate vs Intrastate E-Way Bill Limits Rules<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#E-Way_Bill_State-Wise_Limits_in_India_Updated_Chart\" >E-Way Bill State-Wise Limits in India (Updated Chart)<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#E-Way_Bill_Limit_in_Major_States\" >E-Way Bill Limit in Major States<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#How_to_Generate_E-Way_Bills_Step-by-Step_Process\" >How to Generate E-Way Bills: Step-by-Step Process<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#1_Accessing_the_E-Way_Bill_Portal\" >1. Accessing the E-Way Bill Portal<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#2_Filling_Out_Form_GST_EWB-01\" >2. Filling Out Form GST EWB-01<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#3_Bill_Generation_and_Validation\" >3. Bill Generation and Validation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#4_Bill_Generation_and_Validation\" >4. Bill Generation and Validation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#5_Record_Keeping_Compliance\" >5. Record Keeping &amp; Compliance<\/a><\/li><\/ul><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#Conclusion\" >Conclusion<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#FAQs_on_E-Way_Bill_Limits\" >FAQs on E-Way Bill Limits<\/a><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><ul class='ez-toc-list-level-4' ><li class='ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#What_is_the_current_e-way_bill_limit_in_Maharashtra\" >What is the current e-way bill limit in Maharashtra?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#What_is_the_intrastate_e-way_bill_threshold_in_Delhi_and_Rajasthan\" >What is the intrastate e-way bill threshold in Delhi and Rajasthan?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#What_is_the_West_Bengal_e-way_bill_limit_after_December_2023\" >What is the West Bengal e-way bill limit after December 2023?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#What_documents_are_needed_to_generate_an_e-way_bill\" >What documents are needed to generate an e-way bill?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#Does_the_e-way_bill_limit_change_between_states\" >Does the e-way bill limit change between states?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#What_is_the_minimum_distance_for_e-way_bill_generation\" >What is the minimum distance for e-way bill generation?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-4'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/#Is_e-way_bill_required_for_job_work_within_a_state\" >Is e-way bill required for job work within a state?<\/a><\/li><\/ul><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n\n<p class=\"wp-block-paragraph\">You are transporting a consignment of value \u20b980,000 across state boundaries. At a checkpost, the authorities halt your vehicle and demand an e-way bill, which you hadn\u2019t produced, thinking it was necessary only for consignments above \u20b91 lakh. Not anymore.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The central GST legislation requires an e-way bill for all interstate transportation of goods in excess of \u20b950,000, which is applicable equally to all states and union territories. As your goods are subject to an 18% tax rate, defaulting on this requirement may now invite a penalty of \u20b914,400, which is the total GST payable on your consignment. And then there are the detained consignments, late deliveries, and disgruntled customers, which will soon turn a small mistake into a costly nightmare.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Though for interstate transport, the limit is the same at \u20b950,000 across the entire country, the limit for transporting goods within the state is set by each state. And these rates can differ from \u20b950,000 in Karnataka to \u20b92 lakh within the city limits of Rajasthan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To stay compliant and keep your supply chain flowing, this blog will help you know exactly where each state stands.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_Is_an_E-Way_Bill_Under_GST\"><\/span><strong>What Is an E-Way Bill Under GST?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An e-way bill is a digital compliance document that is made compulsory as per the law under India&#8217;s <a href=\"https:\/\/www.cashfree.com\/blog\/what-is-gst-goods-and-service-tax\/\">Goods and Services Tax (GST) framework<\/a>. It becomes mandatory if the value of goods for which transportation is being done, exceeds a set limit. The system helps the government track goods movement and reduce tax evasion while streamlining logistics for businesses.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Generated electronically via the official portal, the e-way bill, officially known as Form EWB-01, must be carried by the transporter or supplier during transit.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Interstate_vs_Intrastate_E-Way_Bill_Limits_Rules\"><\/span>Interstate vs Intrastate E-Way Bill Limits Rules<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Under the Central GST law, an e-way bill is mandatory for any interstate transportation of goods if the invoice value exceeds \u20b950,000. This national threshold applies uniformly across all 28 states and 8 union territories. For example, moving goods from Maharashtra to Karnataka above this value always requires an e-way bill, regardless of state-specific intrastate policies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, the government has given states the flexibility to define their own thresholds for intrastate movement. Most states have increased the bar to \u20b91 lakh, and Rajasthan goes up to \u20b92 lakh for movement to cities.&nbsp;<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\"><strong>Tips:<\/strong> Companies need to identify the origin and destination of each route in relation to the state-defined thresholds before dispatching the goods.<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"E-Way_Bill_State-Wise_Limits_in_India_Updated_Chart\"><\/span>E-Way Bill State-Wise Limits in India (Updated Chart)<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">To comply with the e-way bill rules in India, it is necessary to be aware of the state-wise thresholds to avoid any kind of penalty and ensure hassle-free logistics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This e way bill state wise chart helps businesses quickly identify intrastate and interstate thresholds applicable across India.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>State\/UT<\/strong><\/td><td><strong>Intrastate Threshold<\/strong><\/td><td><strong>Interstate Threshold<\/strong><\/td><td><strong>Effective From<\/strong><\/td><td><strong>Special Conditions\/Notes<\/strong><\/td><\/tr><tr><td>Andhra Pradesh<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Arunachal Pradesh<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Assam<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Bihar<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Chhattisgarh<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Goa<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Gujarat<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Haryana<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Himachal Pradesh<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>July 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Jharkhand<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Karnataka<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Kerala<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Madhya Pradesh<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Maharashtra<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>July 2018<\/td><td>Some job work exemptions under 50km<\/td><\/tr><tr><td>Manipur<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Meghalaya<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Mizoram<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Nagaland<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Odisha<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Punjab<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Rajasthan<\/td><td>\u20b92,00,000 (within city), \u20b91,00,000 (between cities)<\/td><td>\u20b950,000<\/td><td>February 2022<\/td><td>Dual thresholds; \u20b91L for tobacco\/wood\/iron\/steel within city<\/td><\/tr><tr><td>Sikkim<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Tamil Nadu<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>Telangana<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Tripura<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Uttar Pradesh<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Aligned with central standard<\/td><\/tr><tr><td>Uttarakhand<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>July 2018<\/td><td>Higher intrastate threshold<\/td><\/tr><tr><td>West Bengal<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>December 2023<\/td><td>Reduced from \u20b91L in Dec 2023 (Notification 2\/2023)<\/td><\/tr><tr><td>Andaman &amp; Nicobar<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Union Territory; aligned with central standard<\/td><\/tr><tr><td>Chandigarh<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>Union Territory; higher intrastate threshold<\/td><\/tr><tr><td>Dadra &amp; Nagar Haveli and Daman &amp; Diu<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>Merged UT; aligned with central standard<\/td><\/tr><tr><td>Delhi (NCT)<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>NCT; higher intrastate threshold<\/td><\/tr><tr><td>Jammu &amp; Kashmir<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>UT; aligned with central standard<\/td><\/tr><tr><td>Ladakh<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>October 2019<\/td><td>UT (formed 2019); aligned with central standard<\/td><\/tr><tr><td>Lakshadweep<\/td><td>\u20b950,000<\/td><td>\u20b950,000<\/td><td>April 2018<\/td><td>UT; aligned with central standard<\/td><\/tr><tr><td>Puducherry<\/td><td>\u20b91,00,000<\/td><td>\u20b950,000<\/td><td>June 2018<\/td><td>UT; higher intrastate threshold<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Key Patterns and Insights<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>States\/UTs with \u20b91,00,000 Intrastate Threshold:<\/strong> Bihar, Chhattisgarh, Gujarat, Haryana, Himachal Pradesh, Jharkhand, Madhya Pradesh, Maharashtra, Odisha, Punjab, Tamil Nadu, Uttarakhand, Chandigarh, Delhi, Puducherry<\/li>\n\n\n\n<li><strong>States\/UTs Aligned with \u20b950,000 Central Standard:<\/strong> Andhra Pradesh, Arunachal Pradesh, Assam, Goa, Karnataka, Kerala, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim, Telangana, Tripura, Uttar Pradesh, West Bengal (from Dec 2023), Andaman &amp; Nicobar, Dadra &amp; Nagar Haveli and Daman &amp; Diu, Jammu &amp; Kashmir, Ladakh, Lakshadweep<\/li>\n\n\n\n<li><strong>Unique Systems:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Rajasthan: Only state with geography-based dual threshold: \u20b92L within city, \u20b91L between cities<\/li>\n\n\n\n<li>West Bengal: Recently reduced intrastate threshold from \u20b91L to \u20b950K (Dec 2023)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Uniform Interstate Threshold: All states\/UTs follow uniform \u20b950,000 rule per central GST guidelines<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"E-Way_Bill_Limit_in_Major_States\"><\/span>E-Way Bill Limit in Major States<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>E-Way Bill Limit in Maharashtra<\/strong>: Maharashtra requires an e-way bill for intrastate movement of goods exceeding \u20b91,00,000. For interstate transportation, the standard \u20b950,000 threshold applies uniformly. Certain job-work movements within 50 km may be exempt from Part-B requirements.<\/li>\n\n\n\n<li><strong>E-Way Bill Limit in Delhi<\/strong>: In Delhi (NCT), an e-way bill is mandatory for intrastate consignments valued above \u20b91,00,000. For goods moving outside Delhi, the interstate limit of \u20b950,000 applies, in line with central GST regulations.<\/li>\n\n\n\n<li><strong>E-Way Bill Limit in Rajasthan<\/strong>: Rajasthan follows a dual intrastate threshold system. An e-way bill is required for goods exceeding \u20b92,00,000 within city limits and \u20b91,00,000 for movement between cities. Interstate transport remains subject to the \u20b950,000 limit.<\/li>\n\n\n\n<li><strong>E-Way Bill Limit in West Bengal<\/strong>: West Bengal mandates an e-way bill for all intrastate movements above \u20b950,000, following a reduction from \u20b91 lakh in December 2023. The \u20b950,000 interstate threshold continues to apply for cross-border movement.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_to_Generate_E-Way_Bills_Step-by-Step_Process\"><\/span><strong>How to Generate E-Way Bills: Step-by-Step Process<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Generating e-way bills correctly is essential to keeping your goods moving without regulatory roadblocks. Whether you&#8217;re a supplier, transporter, or recipient, getting the process right helps you avoid delays, penalties, and compliance issues.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Here\u2019s a structured step-by-step guide on how to generate e-way bills using the official <a href=\"https:\/\/www.cashfree.com\/blog\/gst-login-password-portal-guide\/\">GST portal<\/a>:<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"1_Accessing_the_E-Way_Bill_Portal\"><\/span><strong>1. Accessing the E-Way Bill Portal<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<ol class=\"wp-block-list\">\n<li><\/li>\n<\/ol>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Visit <a href=\"https:\/\/ewaybillgst.gov.in\" target=\"_blank\" rel=\"noreferrer noopener nofollow\">ewaybillgst.gov.in<\/a>&nbsp;<\/li>\n\n\n\n<li>Log in using your GSTIN (Goods and Services Tax Identification Number) and registered credentials.<\/li>\n\n\n\n<li>Businesses that don\u2019t generate e-way bills themselves can authorize transporters or third-party providers to do so on their behalf.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"2_Filling_Out_Form_GST_EWB-01\"><\/span><strong>2. Filling Out Form GST EWB-01<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">This form collects all necessary shipment, invoice, and transport-related data. It\u2019s divided into Part A (consignment details) and Part B (transportation details).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Invoice Details<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Invoice or challan number and date<\/li>\n\n\n\n<li>Type of document (Tax invoice, Bill of Supply, or Delivery Challan)<\/li>\n\n\n\n<li>Nature of transaction (Outward, Inward, Import, Export, Job work)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Goods Details<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.cashfree.com\/blog\/hsn-sac-code-gst\/\">HSN or SAC code of the goods<\/a><\/li>\n\n\n\n<li>Item description and quantity<\/li>\n\n\n\n<li>Total taxable value of goods<\/li>\n\n\n\n<li>Applicable GST rate and calculated tax amount<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Consignor &amp; Consignee Information<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>GSTIN of the supplier and recipient (if registered)<\/li>\n\n\n\n<li>Address of dispatch and delivery<\/li>\n\n\n\n<li>Reason for transportation (e.g., sale, branch transfer, return, exhibition)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Transportation Details<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Mode of transport: Road, Rail, Air, or Ship<\/li>\n\n\n\n<li>Vehicle number or transporter ID (mandatory for road transport)<\/li>\n\n\n\n<li>Transport document number (LR\/GR or equivalent)<\/li>\n\n\n\n<li>Estimated travel distance (affects bill validity)<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"3_Bill_Generation_and_Validation\"><\/span><strong>3. Bill Generation and Validation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Once submitted, the portal verifies all details and generates a 12-digit E-Way Bill Number (EBN).<\/li>\n\n\n\n<li>The bill can be printed or shared digitally.<\/li>\n\n\n\n<li>Part A includes all shipment-related details.<\/li>\n\n\n\n<li>Part B is essential for vehicle details and must be completed before movement begins. Without Part B, the e-way bill is invalid.<\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"4_Bill_Generation_and_Validation\"><\/span><strong>4. Bill Generation and Validation<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>When to generate:<\/strong> Before dispatching the goods. Ideally, within 72 hours of invoice generation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Validity duration:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1 day for every 100 km of travel or part thereof.<\/li>\n\n\n\n<li>Extended timelines apply for challenging terrains (e.g., hilly regions).<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Cancellation window:<\/strong> If goods are not moved, cancel the bill within 24 hours of generation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Midway updates:<\/strong> If the vehicle breaks down or changes during transit, update Part B via portal or SMS to remain compliant.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"5_Record_Keeping_Compliance\"><\/span>5. <strong>Record Keeping &amp; Compliance<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<ul class=\"wp-block-list\">\n<li>All generated e-way bills are stored on the portal for future access.<\/li>\n\n\n\n<li>Businesses must maintain copies, digital or printed, to facilitate verification during transit and audits<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><strong>Conclusion<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">E-way bill compliance plays a vital role in ensuring uninterrupted logistics and cash flow under India\u2019s GST system. While interstate transport consistently requires e-way bills above \u20b950,000, intrastate thresholds vary; some jurisdictions allow up to \u20b91,00,000, while others follow the central \u20b950,000 rule. Notably, West Bengal revised its threshold downward in December 2023, and Rajasthan enforces a unique two-tier system.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For businesses operating across multiple regions, keeping up with these changes is critical to avoid penalties, delayed deliveries, or seized consignments. Automating e-way bill generation and staying audit-ready through accurate documentation can save significant time and cost.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Streamline your <a href=\"https:\/\/www.cashfree.com\/payment-links\/\">business payment transactions with Cashfree<\/a>! Get started now to keep operations compliant and cash flow uninterrupted.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"FAQs_on_E-Way_Bill_Limits\"><\/span><strong>FAQs<\/strong> on E-Way Bill Limits<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_current_e-way_bill_limit_in_Maharashtra\"><\/span>What is the current e-way bill limit in Maharashtra?<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Maharashtra mandates an e-way bill for intrastate goods movement exceeding \u20b91,00,000 and for all interstate consignments above \u20b950,000, as per CGST guidelines.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_intrastate_e-way_bill_threshold_in_Delhi_and_Rajasthan\"><\/span>What is the intrastate e-way bill threshold in Delhi and Rajasthan?<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Delhi follows a \u20b91,00,000 limit within NCT. Rajasthan uses a two-tier system: \u20b92 lakh within a city, \u20b91 lakh between cities, with exceptions for specific commodities.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_West_Bengal_e-way_bill_limit_after_December_2023\"><\/span>What is the West Bengal e-way bill limit after December 2023?<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">West Bengal revised its intrastate threshold to \u20b950,000 in December 2023, aligning with the interstate GST limit and central standard for uniform goods movement compliance.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_documents_are_needed_to_generate_an_e-way_bill\"><\/span>What documents are needed to generate an e-way bill?<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">You\u2019ll need the tax invoice or challan, transporter details, GSTINs of both parties, and vehicle or transporter ID to complete Form EWB-01 on the e-way bill portal.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Does_the_e-way_bill_limit_change_between_states\"><\/span>Does the e-way bill limit change between states?<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. While interstate movement always requires an e-way bill above \u20b950,000, each state can set its own intrastate threshold, ranging from \u20b950,000 to \u20b92 lakh.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_is_the_minimum_distance_for_e-way_bill_generation\"><\/span>What is the minimum distance for e-way bill generation?<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">An e-way bill must be generated for taxable goods exceeding the threshold value, regardless of distance. However, validity is calculated at 1 day per 100 km of travel.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Is_e-way_bill_required_for_job_work_within_a_state\"><\/span>Is e-way bill required for job work within a state?<span class=\"ez-toc-section-end\"><\/span><\/h4>\n\n\n\n<p class=\"wp-block-paragraph\">Yes, job work movements may require an e-way bill depending on the state and distance, especially if exceeding 50 km from the principal place of business.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>In case you missed it:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/www.cashfree.com\/blog\/what-is-gst-goods-and-service-tax\/\" target=\"_blank\" rel=\"noreferrer noopener\">What is GST?<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.cashfree.com\/blog\/gst-return-filing\/\" target=\"_blank\" rel=\"noreferrer noopener\">GST Return Filing Guide 2026: New Rules, Due Dates &amp; How to File<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.cashfree.com\/blog\/gst-registration-online-process-documents\/\" target=\"_blank\" rel=\"noreferrer noopener\">How to Apply for GST Number, Process &amp; Documents<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.cashfree.com\/blog\/input-tax-credit-gst\/\" target=\"_blank\" rel=\"noreferrer noopener\">What is Input Tax Credit (ITC)?<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.cashfree.com\/blog\/hsn-sac-code-gst\/\">HSN &amp; SAC Code: Full Form, Usage and Compliance Guide in GST<\/a><\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>You are transporting a consignment of value \u20b980,000 across state boundaries. At a checkpost, the authorities halt your vehicle and demand an e-way bill, which you hadn\u2019t produced, thinking it was necessary only for consignments above \u20b91 lakh. Not anymore. The central GST legislation requires an e-way bill for all interstate transportation of goods in<\/p>\n","protected":false},"author":142,"featured_media":32439,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"_themeisle_gutenberg_block_has_review":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_wpcom_ai_launchpad_first_post":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[9970],"tags":[],"class_list":["post-32421","post","type-post","status-publish","format-standard","has-post-thumbnail","category-gst"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>State-Wise E-Way Bill Limit in India: Time Limits, Thresholds &amp; Rules<\/title>\n<meta name=\"description\" content=\"Check the latest e-way bill limit in India. Learn state-wise intrastate thresholds, \u20b950,000 interstate rules, distance and time based validity.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"State-Wise E-Way Bill Limit in India: Time Limits, Thresholds &amp; Rules\" \/>\n<meta property=\"og:description\" content=\"Check the latest e-way bill limit in India. Learn state-wise intrastate thresholds, \u20b950,000 interstate rules, distance and time based validity.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/\" \/>\n<meta property=\"og:site_name\" content=\"Cashfree Payments Blog\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-07T03:15:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-07T03:18:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/blogrevamp.cashfree.com\/wp-content\/uploads\/2026\/02\/e-way-bill.png?fit=1200%2C800&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Rishabh Ranjan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Rishabh Ranjan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"State-Wise E-Way Bill Limit in India: Time Limits, Thresholds & Rules","description":"Check the latest e-way bill limit in India. Learn state-wise intrastate thresholds, \u20b950,000 interstate rules, distance and time based validity.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/","og_locale":"en_US","og_type":"article","og_title":"State-Wise E-Way Bill Limit in India: Time Limits, Thresholds & Rules","og_description":"Check the latest e-way bill limit in India. Learn state-wise intrastate thresholds, \u20b950,000 interstate rules, distance and time based validity.","og_url":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/","og_site_name":"Cashfree Payments Blog","article_published_time":"2026-02-07T03:15:59+00:00","article_modified_time":"2026-02-07T03:18:33+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/i0.wp.com\/blogrevamp.cashfree.com\/wp-content\/uploads\/2026\/02\/e-way-bill.png?fit=1200%2C800&ssl=1","type":"image\/png"}],"author":"Rishabh Ranjan","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Rishabh Ranjan","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/#article","isPartOf":{"@id":"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/"},"author":{"name":"Rishabh Ranjan","@id":"https:\/\/blogrevamp.cashfree.com\/#\/schema\/person\/f062683aff5362102e9c5b7541c1328c"},"headline":"E-Way Bill Limit in India: State-Wise Thresholds, Distance Rules &#038; Applicability","datePublished":"2026-02-07T03:15:59+00:00","dateModified":"2026-02-07T03:18:33+00:00","mainEntityOfPage":{"@id":"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/"},"wordCount":1763,"commentCount":0,"image":{"@id":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/blogrevamp.cashfree.com\/wp-content\/uploads\/2026\/02\/e-way-bill.png?fit=1200%2C800&ssl=1","articleSection":["GST"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/blogrevamp.cashfree.com\/state-wise-eway-bill-limit\/","url":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/","name":"State-Wise E-Way Bill Limit in India: Time Limits, Thresholds & Rules","isPartOf":{"@id":"https:\/\/blogrevamp.cashfree.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/#primaryimage"},"image":{"@id":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/blogrevamp.cashfree.com\/wp-content\/uploads\/2026\/02\/e-way-bill.png?fit=1200%2C800&ssl=1","datePublished":"2026-02-07T03:15:59+00:00","dateModified":"2026-02-07T03:18:33+00:00","author":{"@id":"https:\/\/blogrevamp.cashfree.com\/#\/schema\/person\/f062683aff5362102e9c5b7541c1328c"},"description":"Check the latest e-way bill limit in India. Learn state-wise intrastate thresholds, \u20b950,000 interstate rules, distance and time based validity.","breadcrumb":{"@id":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/#primaryimage","url":"https:\/\/i0.wp.com\/blogrevamp.cashfree.com\/wp-content\/uploads\/2026\/02\/e-way-bill.png?fit=1200%2C800&ssl=1","contentUrl":"https:\/\/i0.wp.com\/blogrevamp.cashfree.com\/wp-content\/uploads\/2026\/02\/e-way-bill.png?fit=1200%2C800&ssl=1","width":1200,"height":800,"caption":"e-way bill"},{"@type":"BreadcrumbList","@id":"https:\/\/www.cashfree.com\/blog\/state-wise-eway-bill-limit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blogrevamp.cashfree.com\/"},{"@type":"ListItem","position":2,"name":"GST","item":"https:\/\/blogrevamp.cashfree.com\/category\/gst\/"},{"@type":"ListItem","position":3,"name":"E-Way Bill Limit in India: State-Wise Thresholds, Distance Rules &#038; Applicability"}]},{"@type":"WebSite","@id":"https:\/\/blogrevamp.cashfree.com\/#website","url":"https:\/\/blogrevamp.cashfree.com\/","name":"Cashfree Payments Blog","description":"Cashfree Payments- Payment Gateway for India","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blogrevamp.cashfree.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blogrevamp.cashfree.com\/#\/schema\/person\/f062683aff5362102e9c5b7541c1328c","name":"Rishabh Ranjan","url":"https:\/\/blogrevamp.cashfree.com\/author\/rishabh-ranjan\/"}]}},"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p9MjXo-8qV","jetpack_likes_enabled":false,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/blogrevamp.cashfree.com\/wp-content\/uploads\/2026\/02\/e-way-bill.png?fit=1200%2C800&ssl=1","_links":{"self":[{"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/posts\/32421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/users\/142"}],"replies":[{"embeddable":true,"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/comments?post=32421"}],"version-history":[{"count":21,"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/posts\/32421\/revisions"}],"predecessor-version":[{"id":32460,"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/posts\/32421\/revisions\/32460"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/media\/32439"}],"wp:attachment":[{"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/media?parent=32421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/categories?post=32421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogrevamp.cashfree.com\/wp-json\/wp\/v2\/tags?post=32421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}